Flue gas processing behind an electrically heated cremation furnance
Upgrade of an electric incineration plant for the stricter requirements of the Air Pollution Control Ordinance.
Upgrade of an electric incineration plant for the stricter requirements of the Air Pollution Control Ordinance.
New construction of a double incineration plant with a nominal throughput of 2 x 30 kg / h.
Double tunnel incineration plant for push-through operation.
Construction of a prototype for saturated steam generation from production residues.